30 research outputs found

    First step towards the new SPIRAL2 project control system

    Get PDF
    International audienceThe Spiral2 project at Ganil aims to produce rare ion beams using a Uranium carbide target fission process. The accelerator consists of a RFQ followed by a superconducting cavity linac and is designed to provide high intensity primary beams (deuterons, protons or heavy ions). The accelerator should be commissioned by the end of 2011; then, the first tests aiming to produce exotic beams are planned one year later. The control system will result of the collaboration between several institutes among which the Saclay Dapnia division yet having a good experience and knowledge with Epics. So and also because of its widely used functionalities, Epics has been chosen as the basic framework for the accelerator control and people from the other laboratories belonging to the collaboration are progressively acquiring a first experience with Epics. The paper first explains the organisation of the collaboration then it describes the basic hardware and software choices for the project. Some preliminary implementations are therefore given. As the project is still in its beginning phase, the paper ends by listing some interrogations not yet solved for the control system definition and opened for discussion

    The SARAF-LINAC Project for SARAF-PHASE 2

    Get PDF
    THPF005International audienceSNRC and CEA collaborate to the upgrade of theSARAF accelerator to 5 mA CW 40 MeV deuteron andproton beams (Phase 2). This paper presents the referencedesign of the SARAF-LINAC Project including a fourvane176 MHz RFQ, a MEBT and a superconducting linacmade of four five-meter cryomodules housing 26superconducting HWR cavities and 20 superconductingsolenoids. The first two identical cryomodules house lowbeta(β\betaopt = 0.091), 280 mm long (flange to flange), 176MHz HWR cavities, the two identical last cryomoduleshouse high-beta (β\betaopt = 0.181), 410 mm long, 176 MHz,HWR cavities. The beam is focused with superconductingsolenoids located between cavities housing steering coils.A BPM is placed upstream each solenoid

    The SPIRAL2 control system progress towards the commissioning phase

    Get PDF
    MOCOAAB03, http://accelconf.web.cern.ch/AccelConf/ICALEPCS2013/papers/mocoaab03.pdfInternational audienceThe commissioning of the first phase of the Spiral2 Radioactive Ion Beams facility at Ganil will soon start, so requiring the control system components to be delivered in time. Yet, parts of the system were validated during preliminary tests performed with ions and deuterons beams at low energy. The control system development results from the collaboration between Ganil, CEA-IRFU, CNRS-IPHC laboratories, using appropriate tools and approach. Based on Epics, the control system follows a classical architecture. At the lowest level, Modbus/TCP protocol is considered as a field bus. Then, equipment are handled by IOCs (soft or VME/VxWorks) with a software standardized interface between IOCs and clients applications on top. This last upper layer consists of Epics standard tools, CSS/BOY user interfaces within the socalled CSSop Spiral2 context suited for operation and, for machine tunings, high level applications implemented by Java programs developed within a Spiral2 framework derived from the open-Xal one. Databases are used for equipment data and alarms archiving, to configure equipment and to manage the machine lattice and beam settings. A global overview of the system is therefore here proposed

    Preliminary implementation for the new SPIRAL2 project control system

    Get PDF
    International audienceThe Spiral2 project consists of a new facility to provide high intensity rare ions beams. It is based on a primary beam driver accelerator (RFQ followed by a superconducting linac) and a rare ion production process delivering the beam either to a low energy experimental area or to the existing Ganil facility. From October this year, one ion source coupled with a first beam line section will be in test; then, the injector (ion and deuteron sources, RFQ) will be tested by the end of 2010 so the whole accelerator should be commissioned by the end of 2011; the first exotic beams being planned one year later. The accelerator control system design results from the collaboration between several institutes and Epics has been chosen as the basic framework. The paper therefore presents the main choices: MVME5500 CPUs, VME I/O boards, VxWorks, Siemens PLCs, Modbus field buses, EDM screens and Java applications, Linux PCs, use of a LabView/Epics gateway... Specific topics are the evaluation of the XAL environment, an Epics design to address the power supplies, an emittance measurement system, the development of a beam profiler interface and the investigation for a triggered acquisition system

    A Small but Efficient Collaboration for the Spiral2 Control System Development

    Get PDF
    http://accelconf.web.cern.ch/AccelConf/ICALEPCS2013/papers/tucobab01.pdfThe Spiral2 radioactive ion beam facility to be commissioned in 2014 at Ganil (Caen) is built within international collaborations. This also concerns the control system development shared by three laboratories: Ganil has to coordinate the control and automated systems work packages, CEA/IRFU is in charge of the "injector" (sources and low energy beam lines) and the LLRF, CNRS/IPHC provides the emittancemeters and a beam diagnostics platform. Besides the technology Epics based, this collaboration, although being handled with a few people, nevertheless requires an appropriate and tight organization to reach the objectives given by the project. This contribution describes how, started in 2006, the collaboration for controls has been managed both from the technological point of view and the organizational one, taking into account not only the previous experience, technical background or skill of each partner, but also their existing working practices and "cultural" approaches. A first feedback comes from successful beam tests carried out at Saclay and Grenoble; a next challenge is the migration to operation, Ganil having to run Spiral2 as the other members are moving to new projects

    The Mid-Infrared Instrument for the James Webb Space Telescope, III: MIRIM, The MIRI Imager

    Get PDF
    In this article, we describe the MIRI Imager module (MIRIM), which provides broad-band imaging in the 5 - 27 microns wavelength range for the James Webb Space Telescope. The imager has a 0"11 pixel scale and a total unobstructed view of 74"x113". The remainder of its nominal 113"x113" field is occupied by the coronagraphs and the low resolution spectrometer. We present the instrument optical and mechanical design. We show that the test data, as measured during the test campaigns undertaken at CEA-Saclay, at the Rutherford Appleton Laboratory, and at the NASA Goddard Space Flight Center, indicate that the instrument complies with its design requirements and goals. We also discuss the operational requirements (multiple dithers and exposures) needed for optimal scientific utilization of the MIRIM.Comment: 29 pages, 9 figure

    The COMPASS Experiment at CERN

    Get PDF
    The COMPASS experiment makes use of the CERN SPS high-intensitymuon and hadron beams for the investigation of the nucleon spin structure and the spectroscopy of hadrons. One or more outgoing particles are detected in coincidence with the incoming muon or hadron. A large polarized target inside a superconducting solenoid is used for the measurements with the muon beam. Outgoing particles are detected by a two-stage, large angle and large momentum range spectrometer. The setup is built using several types of tracking detectors, according to the expected incident rate, required space resolution and the solid angle to be covered. Particle identification is achieved using a RICH counter and both hadron and electromagnetic calorimeters. The setup has been successfully operated from 2002 onwards using a muon beam. Data with a hadron beam were also collected in 2004. This article describes the main features and performances of the spectrometer in 2004; a short summary of the 2006 upgrade is also given.Comment: 84 papes, 74 figure

    Status of the llrf system for SARAF phase II

    No full text
    International audienceCEA is committed to the design, construction and commissioning of a Medium Energy Beam Transfer line and a superconducting linac (SCL) for SARAF accelerator in order to accelerate 5mA beam of either protons from 1.3 MeV to 35 MeV or deuterons from 2.6 MeV to 40 MeV. The Low Level RF (LLRF) is a subsystem of the CEA control domain for the SARAF-LINAC instrumentation. The top level requirement of the LLRF system has been presented in the last LLRF conference. The paper shows a simulink model to analyse and determinate the LLRF technical specification. The public bidding for SARAF LLRF is in the last phase: discussion with the selected company. The first prototype test will be performed at the start of 2020
    corecore